{"id":13929,"date":"2024-06-24T17:29:33","date_gmt":"2024-06-24T21:29:33","guid":{"rendered":"https:\/\/pluginamerica.org\/?p=13929"},"modified":"2024-06-24T17:31:09","modified_gmt":"2024-06-24T21:31:09","slug":"national-electric-vehicle-infrastructure-nevi-charging-updates","status":"publish","type":"post","link":"https:\/\/pluginamerica.org\/national-electric-vehicle-infrastructure-nevi-charging-updates\/","title":{"rendered":"National Electric Vehicle Infrastructure (NEVI) Charging Updates"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">Rome wasn\u2019t built in a day, and a massive national infrastructure project to build out a network of <\/span><a href=\"https:\/\/www.fhwa.dot.gov\/environment\/alternative_fuel_corridors\/\"><span style=\"font-weight: 400;\">Alternative Fuel Corridors<\/span><\/a><span style=\"font-weight: 400;\"> across the country is no different. In general, infrastructure projects involve many stakeholders, include many complex steps and milestones, and can get hung up at any number of points throughout the project.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Over 57,000 public infrastructure investments resulted from the passage of the Bipartisan Infrastructure Law (BIL). The project list is broad. Among other things, it includes installing wastewater systems, building out broadband, replacing aged gas pipelines, supporting resilience projects, enhancing public transportation, fortifying the electric grid, upgrading railways, and constructing roads and bridges. While different sectors are seeing varying amounts of federal infrastructure funding awarded, there has been steady progress.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The vast majority of bridges, roadways, pipelines, and broadband projects are still in the planning process. We dove into the spreadsheet of projects publicly available on the <\/span><a href=\"http:\/\/invest.gov\"><span style=\"font-weight: 400;\">invest.gov<\/span><\/a><span style=\"font-weight: 400;\"> website to get a timeline for how long infrastructure projects take to complete. While we didn\u2019t review all 57,000 projects, we researched one bridge in Connecticut slated for replacement with funding through the BIL. After some digging, we found that it is expected to be completed in <\/span><a href=\"https:\/\/www.ctinsider.com\/connecticut\/article\/ct-billion-dollar-bridges-infrastructure-amtrak-18456623.php\"><span style=\"font-weight: 400;\">2029<\/span><\/a><span style=\"font-weight: 400;\">.\u00a0<\/span><\/p>\n<p><b>Infrastructure buildout is slow, and EV charging is no different.<\/b><span style=\"font-weight: 400;\">\u00a0<\/span><\/p>\n<p><b>Federal Planning\u2013Standing up the Joint Office<\/b><\/p>\n<p><span style=\"font-weight: 400;\">It would be risky to embark on a $5 billion endeavor without planning. Because this massive transportation electrification project is the first of its kind, and because the law mandated it, the Federal Government had to bring the Department of Energy and the Department of Transportation together to address both the transportation and electricity elements of these projects.\u00a0 The Joint Office, was created with staff from both departments. Experts were hired, processes were developed, and resources\u2013including a website\u2013 were created.\u00a0<\/span><\/p>\n<p><b>State Planning<\/b><\/p>\n<p><span style=\"font-weight: 400;\">Each state and territory was required to file a plan for creating alternative fuel corridors to receive funding. To do this, states collected information from diverse stakeholders through engaging communities, coordinating state agencies, and consulting utilities, municipalities, and businesses. The Joint Office then reviewed and approved all of the state plans.\u00a0<\/span><\/p>\n<p><b>Federal Rulemaking<\/b><\/p>\n<p><span style=\"font-weight: 400;\">The Bipartisan Infrastructure Law (BIL) that authorized the NEVI program required a federal rulemaking process to establish minimum standards and requirements for the program to ensure that the $5 billion would create a national charging network that would be effective, efficient, and would meet the needs of EV drivers for years to come. While states were developing plans, program requirements were being finalized.<\/span><\/p>\n<p><b>State Funding<\/b><\/p>\n<p><span style=\"font-weight: 400;\">Once plans were accepted and standards finalized, the federal government began distributing money to states. Many states had to adapt their processes to account for the close coordination between their Departments of Transportation and Energy on these charging construction projects. According to <\/span><a href=\"https:\/\/www.atlasevhub.com\/\"><span style=\"font-weight: 400;\">Atlas EV Hub<\/span><\/a><span style=\"font-weight: 400;\">, as of May 6th, over $300 million had been awarded by 20 states through the NEVI program.\u00a0<\/span><\/p>\n<p><b>The Construction Process<\/b><\/p>\n<p><span style=\"font-weight: 400;\">Once the states issue funding to selected contractors, the construction process can begin with land acquisition, engineering, design, permitting, utility coordination and infrastructure upgrades (sometimes slowed by supply chain disruptions), construction, installation, and charger completion and activation.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Given all of the planning and processes necessary, it is phenomenal to see a handful of states have NEVI chargers up and running. Now that the structure and processes are established, we look forward to seeing an acceleration of NEVI stations coming online over the coming months. <\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Rome wasn\u2019t built in a day, and a massive national infrastructure project to build out a network of Alternative Fuel Corridors across the country is no different. In general, infrastructure projects involve many stakeholders, include many complex steps and milestones, and can get hung up at any number of points[&#8230;]<\/p>\n","protected":false},"author":56,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"content-type":"","inline_featured_image":false,"episode_type":"","audio_file":"","cover_image":"","cover_image_id":"","duration":"","filesize":"","filesize_raw":"","date_recorded":"","explicit":"","block":"","itunes_episode_number":"","itunes_title":"","itunes_season_number":"","itunes_episode_type":"","footnotes":""},"categories":[20],"tags":[],"class_list":["post-13929","post","type-post","status-publish","format-standard","hentry","category-policy"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.6 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>National Electric Vehicle Infrastructure (NEVI) Charging Updates - Plug In America<\/title>\n<meta name=\"description\" content=\"The challenges of spending $5 billion of federal money and the steps that go into building a single National Electric Vehicle Infrastructure (NEVI) charging site.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/pluginamerica.org\/national-electric-vehicle-infrastructure-nevi-charging-updates\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"National Electric Vehicle Infrastructure (NEVI) Charging Updates - Plug In America\" \/>\n<meta property=\"og:description\" content=\"The challenges of spending $5 billion of federal money and the steps that go into building a single National Electric Vehicle Infrastructure (NEVI) charging site.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/pluginamerica.org\/national-electric-vehicle-infrastructure-nevi-charging-updates\/\" \/>\n<meta property=\"og:site_name\" content=\"Plug In America\" \/>\n<meta property=\"article:published_time\" content=\"2024-06-24T21:29:33+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-06-24T21:31:09+00:00\" \/>\n<meta name=\"author\" content=\"Plug In America\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Plug In America\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/pluginamerica.org\/national-electric-vehicle-infrastructure-nevi-charging-updates\/\",\"url\":\"https:\/\/pluginamerica.org\/national-electric-vehicle-infrastructure-nevi-charging-updates\/\",\"name\":\"National Electric Vehicle Infrastructure (NEVI) Charging Updates - Plug In America\",\"isPartOf\":{\"@id\":\"https:\/\/pluginamerica.org\/#website\"},\"datePublished\":\"2024-06-24T21:29:33+00:00\",\"dateModified\":\"2024-06-24T21:31:09+00:00\",\"author\":{\"@id\":\"https:\/\/pluginamerica.org\/#\/schema\/person\/5d709d3643f8ed2dc7633bfcee51660d\"},\"description\":\"The challenges of spending $5 billion of federal money and the steps that go into building a single National Electric Vehicle Infrastructure (NEVI) charging site.\",\"breadcrumb\":{\"@id\":\"https:\/\/pluginamerica.org\/national-electric-vehicle-infrastructure-nevi-charging-updates\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/pluginamerica.org\/national-electric-vehicle-infrastructure-nevi-charging-updates\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/pluginamerica.org\/national-electric-vehicle-infrastructure-nevi-charging-updates\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/pluginamerica.org\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"National Electric Vehicle Infrastructure (NEVI) Charging Updates\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/pluginamerica.org\/#website\",\"url\":\"https:\/\/pluginamerica.org\/\",\"name\":\"Plug In America\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/pluginamerica.org\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/pluginamerica.org\/#\/schema\/person\/5d709d3643f8ed2dc7633bfcee51660d\",\"name\":\"Plug In America\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/pluginamerica.org\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7031e2351a673f61763ad1bee366e6325c776d8ed848ef5d939bbb21c4343e11?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7031e2351a673f61763ad1bee366e6325c776d8ed848ef5d939bbb21c4343e11?s=96&d=mm&r=g\",\"caption\":\"Plug In America\"},\"url\":\"https:\/\/pluginamerica.org\/author\/piadactestaccount\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"National Electric Vehicle Infrastructure (NEVI) Charging Updates - Plug In America","description":"The challenges of spending $5 billion of federal money and the steps that go into building a single National Electric Vehicle Infrastructure (NEVI) charging site.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/pluginamerica.org\/national-electric-vehicle-infrastructure-nevi-charging-updates\/","og_locale":"en_US","og_type":"article","og_title":"National Electric Vehicle Infrastructure (NEVI) Charging Updates - Plug In America","og_description":"The challenges of spending $5 billion of federal money and the steps that go into building a single National Electric Vehicle Infrastructure (NEVI) charging site.","og_url":"https:\/\/pluginamerica.org\/national-electric-vehicle-infrastructure-nevi-charging-updates\/","og_site_name":"Plug In America","article_published_time":"2024-06-24T21:29:33+00:00","article_modified_time":"2024-06-24T21:31:09+00:00","author":"Plug In America","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Plug In America","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/pluginamerica.org\/national-electric-vehicle-infrastructure-nevi-charging-updates\/","url":"https:\/\/pluginamerica.org\/national-electric-vehicle-infrastructure-nevi-charging-updates\/","name":"National Electric Vehicle Infrastructure (NEVI) Charging Updates - Plug In America","isPartOf":{"@id":"https:\/\/pluginamerica.org\/#website"},"datePublished":"2024-06-24T21:29:33+00:00","dateModified":"2024-06-24T21:31:09+00:00","author":{"@id":"https:\/\/pluginamerica.org\/#\/schema\/person\/5d709d3643f8ed2dc7633bfcee51660d"},"description":"The challenges of spending $5 billion of federal money and the steps that go into building a single National Electric Vehicle Infrastructure (NEVI) charging site.","breadcrumb":{"@id":"https:\/\/pluginamerica.org\/national-electric-vehicle-infrastructure-nevi-charging-updates\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/pluginamerica.org\/national-electric-vehicle-infrastructure-nevi-charging-updates\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/pluginamerica.org\/national-electric-vehicle-infrastructure-nevi-charging-updates\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/pluginamerica.org\/"},{"@type":"ListItem","position":2,"name":"National Electric Vehicle Infrastructure (NEVI) Charging Updates"}]},{"@type":"WebSite","@id":"https:\/\/pluginamerica.org\/#website","url":"https:\/\/pluginamerica.org\/","name":"Plug In America","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/pluginamerica.org\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/pluginamerica.org\/#\/schema\/person\/5d709d3643f8ed2dc7633bfcee51660d","name":"Plug In America","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/pluginamerica.org\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7031e2351a673f61763ad1bee366e6325c776d8ed848ef5d939bbb21c4343e11?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7031e2351a673f61763ad1bee366e6325c776d8ed848ef5d939bbb21c4343e11?s=96&d=mm&r=g","caption":"Plug In America"},"url":"https:\/\/pluginamerica.org\/author\/piadactestaccount\/"}]}},"_links":{"self":[{"href":"https:\/\/pluginamerica.org\/wp-json\/wp\/v2\/posts\/13929","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pluginamerica.org\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pluginamerica.org\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pluginamerica.org\/wp-json\/wp\/v2\/users\/56"}],"replies":[{"embeddable":true,"href":"https:\/\/pluginamerica.org\/wp-json\/wp\/v2\/comments?post=13929"}],"version-history":[{"count":0,"href":"https:\/\/pluginamerica.org\/wp-json\/wp\/v2\/posts\/13929\/revisions"}],"wp:attachment":[{"href":"https:\/\/pluginamerica.org\/wp-json\/wp\/v2\/media?parent=13929"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pluginamerica.org\/wp-json\/wp\/v2\/categories?post=13929"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pluginamerica.org\/wp-json\/wp\/v2\/tags?post=13929"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}